A local mining company is placing rip-rap along an 800-meter stretch of Carpenter Creek at Sandon.
Klondike Silver is doing the work to keep the creek from overflowing and damaging their tailings pond.
The work is the result of a Ministry of Mines inspection order and is required before the operation can reopen.
- Advertisement -