Listen Live
Listen Live

Local radon gas advocate:more can be done

Changes to the BC building code after a radon mitigation pilot project involving Castlegar is a huge step forward but more can still be done.

This from Dana Schmidt a director with the Donna Schmidt Memorial Lung Cancer Prevention Society.

The initiative found that current systems are not addressing the radon issue and as of December 19th a new system will be required in construction of homes.

Schmidt says the new changes are a small cost increase that is worth preventing cancer – that can be caused by long term exposure to radon.

Schmidt has been advocating for changes to the BC Building code for years after his wife Donna died from lung cancer.

Continue Reading

cjat Now playing play

ckqr Now playing play

- Advertisement -

Related Articles

- Advertisement -

Latest News

B.C. Greens call for a return to vacancy control with new legislation

The B.C. Greens have tabled legislation that would limit how much landlords can raise rents between tenancies. The post B.C. Greens call for a return to vacancy control with new legislation appeared first on AM 1150.

Demolition begins on downtown Trail department store

The Trail Mercantile. Eaton's. The Town Square Mall. Liquidation World. The building at 900 Spokane Street has been known by all of those names since 1917. But within a few weeks it will be no more.

Citizens stop suspected drunk driver near Genelle

A 41-year-old Trail man received a 24-hour driving ban and multiple fines after being forced to pull over by alert witnesses on Highway 22.

Keep the scares spooky, not shocking, says BC Hydro

BC Hydro is urging residents to keep electrical safety in mind with their Halloween displays. The post Keep the scares spooky, not shocking, says BC Hydro appeared first on AM 1150.

Columbia Basin Trust funds upgrades to boost livability and emergency readiness in affordable housing

Affordable housing complexes across the Columbia Basin are set to receive upgrades aimed at improving comfort, accessibility and emergency preparedness, through nearly $3.3 million in new funding from Columbia Basin Trust.
- Advertisement -